PulteGroup Austin
๐Project Overview
๐Scope of Work
uite #300 and #310 full office renovation for Title group and Regional office team, white box Design Center space in Suite #310 for future fit-out, and renovation of #320 suite to provide Training Room.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐Related Austin Permits
City permits found at this location
PARTIAL TENANT IMPROVEMENT ON FLOOR 2 AND 3 CONSITING OF THE ADDITION OF 8 FURNITURE WORK PODS ND ASSOCIATED INFRASTRUCTURE. NO CHANGE TO EXITING. NO CHANGE OF USE exiting adm/bus/prof office
Install gas pipe for generator
Level 2 EV Charger powered by a 40amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <5 feet New 3/4ยฟ EMT conduit to power the Level 2 EV Charger at 32amp constant draw.
Replacement of complete existing central heat and air system with or without duct work
install disconnects for water heaters 2x
installing like/like E water heater