Triad Park
📊Project Metrics
TDLR #TABS2026008337Project Registered
Project has been registered with TDLR and is in pre-construction phase
📋Scope of Work
Two 7200sf metal, single-story shell buildings
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
Install Stand by Generator
Gas line to install stand by Generator
Replacement of an existing water heater replacing the water heater with a tankless water heater
Palomino - Install new 6.57kW rooftop solar system to existing residential only using backfed breaker. Upgrading MSP to 200amp Utility company - PEC
Transitioning from LP gas to natural gas in both buildings (Building 1 and Building 2)