AUS - Midfield Taxiways
πDevelopment Metrics
Infrastructure Project
This site plan is for infrastructure/utility work. Typical development metrics (units, building area) may not apply.
Pending
Site plan case is in the system.
πProject Description
Construct two new taxiways (with two new taxiway bridges), parking lot, roadways, and utilities. Demo existing pavements, utilities, and South Terminal building. Install reclaimed waterline. Tree mitigation. PuPR3 (actually 5, 2 earlys, 2 mids, 1 presub) AEDP PC = KW
π Entitlement Timeline
ποΈZoning & Land Use Analysis
Existing Conditions
Proposed Development
Review Requirements
πNearby Site Plans
Development activity within ~800m
ποΈNearby TDLR Projects
Active construction in the area
Property Owner
Applicant / Developer
City Case Manager
Location & Jurisdiction
Property Records
πAll Site Plan Data
Click to expand
πAll Site Plan Data
Click to expandIdentifiers
Project Numbers
Key Dates
Address
Zoning & Land Use
Geographic
Review Status
Applicant
Owner
ABS 24 DELVALLE S (BERGSTROM AIR FORCE BASE) ACR 1816.519
Construct two new taxiways (with two new taxiway bridges), parking lot, roadways, and utilities. Demo existing pavements, utilities, and South Terminal building. Install reclaimed waterline. Tree mitigation. PuPR3 (actually 5, 2 earlys, 2 mids, 1 presub) AEDP PC = KW