DELL PC1 OCS P
๐Project Overview
๐Scope of Work
MEP Systems Upgrade, new server racks, hot aisle containment. Construction of a new Exterior MEP Equipment Yard in parking lot. Interior Scope includes converting a portion of the existing mezzanine level to mechanical equipment space.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐Related Austin Permits
City permits found at this location
MEP Systems Upgrade new server racks hot aisle containment. Construction of a new Exterior MEP Equipment Yard in parking lot. Interior Scope includes converting a portion of the existing mezzanine level to mechanical equipment space.
Homebuilder Loop for SFR Reference 2025-067849 BP
New construction of 2 story SFR Condo 3 beds 3.5 bathrooms attached garage covered patio
Disconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size.
Install new 3.400 kw rooftop solar system for existing residential only.
EMERGENCY - melted block in panel. Need to replace block and repair wire APPROVED FOR AE RECONNECT ECC--JASON @ 1408---SLC