Easton Park South - Holick Blvd. and Apogee Blvd. Roadway Extensions - Phase 1
๐Project Overview
๐Scope of Work
Construction of a subdivision containing 2 collector level roadways, 1 commercial lot, and 2 pond lots.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐คMore by Carma Easton, LLC
๐Related Austin Permits
City permits found at this location
Replacement of complete existing central heat and air system with or without duct work Attic stairs located in garage.
Three new EV charging stations and a new transformer will be installed.
Three new EV charging stations and a new transformer will be installed.
AE came in and took the meter off so that we could do a repair to the block in the meter can.
FSG will install a channel letter sign to the front entrance replacing the existing sign and tying into the existing wiring.
Interior remodel porch reconstruction (removing post for covered porch and install new headers new sliding doors instead of double doors) rewiring wall removal and relocation (interior) kitchen stove and sink relocation and bathroom and closet renovations