Turnersville Road North
๐Project Overview
๐Scope of Work
Reconstruction of Turnersville Road North of approx. 1,200 linear-feet
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐๏ธMore by Kimley-Horn
๐Related Austin Permits
City permits found at this location
Electric work The service being upgraded is suite #300B. We are taking out wire panel A and B ( before 100 Amp for each ) and then running the EMT 2 conduit from the disconnect to the meter base Suite # 300B then to the 480V pane
Electrical work I have removed all the wires in the 300 As conduit the 300 A electric meter is no longer available. We installed 3/0 wire for the 300 B electric meter. Previously 300A and 300B were 2 separate shops the electricity meter was 100 amp each side I took all the wires from the 300 A meter inside the shop. we installed disconnect 200 amp plus pre-existing electric meter 300B
Replace burned meter socket to existing commerical. EUD. Permit required per Austin Energy.
Emergency replacement of existing electric meter can to existing commercial building only. EUD
Electrical service for new lease space for bee caves ETJ
Water Heater Change Out to Existing Residence