AISD Renovations at Bryker Woods Elementary School
๐Project Overview
๐Scope of Work
The scope includes replacing rooftop mechanical units, replacing (3) electrical panels, replacing door hardware in (2) areas, and replacing exterior windows as prioritized by Austin ISD.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐Related Austin Permits
City permits found at this location
Level 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <60 feet New 3/4ยฟ EMT conduit approx. to power the Level 2 EV Charger at 48amp constant draw.
*Partial demo* Addition/remodel. Addition of a mud room and wood deck landing with stairs to rear of existing noncomplying 1-story SFR. Comprehensive interior remodel. Reconfigure interior layout resulting in a 4 bedroom 3 bathroom residence.
*Partial demo* Addition/remodel. Addition of a mud room and wood deck landing with stairs to rear of existing noncomplying 1-story SFR. Comprehensive interior remodel. Reconfigure interior layout resulting in a 4 bedroom 3 bathroom residence.
*Partial demo* Addition/remodel. Addition of a mud room and wood deck landing with stairs to rear of existing noncomplying 1-story SFR. Comprehensive interior remodel. Reconfigure interior layout resulting in a 4 bedroom 3 bathroom residence.
Temporary Pole for temporary electrical construction power during a residential remodel. reference bp 2020-101999
*Partial demo* Addition/remodel. Addition of a mud room and wood deck landing with stairs to rear of existing noncomplying 1-story SFR. Comprehensive interior remodel. Reconfigure interior layout resulting in a 4 bedroom 3 bathroom residence.